LT or HT? How much power a DC charging station can get in India

Short answer: a DC charger is the largest electrical load most sites will ever ask for, and the utility decides how it arrives. Up to a ceiling, your DISCOM supplies it at 415 volts on an ordinary low-tension connection, the kind a shop or a small workshop has. Above that ceiling the connection becomes high tension: your own transformer, a metering cubicle, an inspection, a yard to put it all in, and months instead of weeks. The general ceiling is not a national number. Each state's regulator sets it in its supply code, and between the strictest state and the most generous it varies about four-fold. But for a charging station there is a national rule on top: the Ministry of Power's 2024 guidelines tell every DISCOM to give an LT connection up to 150 kW, if you apply for a separate connection for the station. The table in this guide lists every state ceiling we have verified from the regulation itself, with the document it comes from and the largest Zevpoint charger that fits under it, and the section below it explains how to use the national rule where your state is stricter.

Sanctioned load is a contract, not a setting

Every connection carries a sanctioned load, printed on the bill: the power you have agreed to draw. Draw more and the meter records it, a penalty follows, and in most states a repeat earns a letter asking you to regularise. Raising it is an application with a fee, a feasibility check and sometimes a wait for the local transformer to have room. For a house this is paperwork. For a DC station it is the project.

So the first question for a site is not "which charger" but "how much can this plot be given, and at what voltage". Everything else, the charger included, follows from the answer.

LT or HT: the one number that decides the budget

Low tension is 415 V three-phase, straight off the DISCOM's transformer, through a meter and into your panel. High tension means the DISCOM hands you 11 kV and the transformer is yours. You buy it, house it, protect it, have it inspected by the electrical inspectorate, and maintain it for the life of the site. The charger costs the same either way. The difference between the two connections is a transformer, an HT panel, a metering cubicle, civil work, an inspection and the time all of that takes, and on a small site that difference can cost more than the charger.

The LT ceiling is therefore the single figure that decides whether a site is a four-week job or a four-month one. That is why we hold it as data with a source, and never as a round number someone remembers.

LT and HT connections for a DC charging station On LT the DISCOM's transformer feeds a meter and your panel, then the charger. On HT the DISCOM hands over 11 kV and you own the transformer, HT panel and metering cubicle before your panel and chargers. LT connection: up to your DISCOM's ceiling DISCOM transformertheirs, on the street 415 V MeterDISCOM's Your LT panelbreakers, earthing DC chargerweeks to connect HT connection: above the ceiling DISCOM line11 kV handover 11 kV Your transformer + HT panel+ metering cubicleyard, CEIG inspection, upkeep 415 V Your LT panelbigger busbars DC chargersmonths to connect Green boxes are yours to buy, house and maintain. The charger is the same in both rows; everything to its left is what the ceiling decides.
What changes between an LT and an HT connection. The charger is identical; the transformer, panel, metering and inspection are what the ceiling adds.

The ceiling is a state rule

Each state's electricity regulator writes a supply code, and somewhere inside it is the load above which supply must be at HT. Some codes say it in kW, some in kVA, one in horsepower. A few states carve out a category for EV charging; most do not. The pattern on the ground: the big northern states are strict, and a dual-gun charger for mass-market cars is already over the line in Haryana, Uttar Pradesh and Rajasthan. Punjab sits in the middle. Delhi, Maharashtra and Karnataka are generous enough that a dual-gun charger in the 120 kW class stays on LT.

A single flat assumption is wrong in both directions. It sends you to HT where LT would have done, and it designs an LT site where the utility will refuse to connect it.

The national rule for charging stations: LT up to 150 kW

The state ceilings above are the general rule for any consumer. Charging stations have one more rule, from the centre. The Ministry of Power's Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure, 2024 (17 September 2024), clause 5(3), says: "Distribution Licensee must provide Low Tension (LT) connection up to 150 kW for charging stations provided, application for a separate LT electricity connection is made for EV charging station."

In practice that changes the advice in the strict states. A dual-gun charger in the 60 to 120 kW class is over the general ceiling in Haryana, Uttar Pradesh and Rajasthan, but under the 150 kW the guidelines allow for a station on its own connection. Three things make it work:

  • Apply for a separate connection for the station. The rule applies to a dedicated EV charging connection, not to adding load to the shop or hotel next to it. The guidelines also require separate metering for every station.
  • Cite the clause in the application. State supply codes have not all been amended to match, and a DISCOM office may quote its own code first. The guideline, the clause and its date belong in the covering letter.
  • Keep the state ceiling as the fallback. If the DISCOM still refuses LT, the state code in the table is what it will apply, and the site is planned for HT.

Above 150 kW, the national rule does not help, and the state ceiling decides. The same guidelines set the time the DISCOM has to release the connection: three days in a metro, seven in other towns, fifteen in rural areas and thirty in hilly rural areas, or ninety where new mains or a substation are needed.

Traps we found reading the rules

We read the regulations rather than summaries of them, and the reading turned up things no summary mentions. Each one sits in the note under its DISCOM in the table above.

  • Haryana's old sales manuals still show a higher band. It protects connections that already existed when the code changed. A new connection gets the lower ceiling.
  • Karnataka's regulator still hosts a consolidated PDF from 2013. It prints a ceiling three times lower than the one in force since the 2020 amendment. Design against the PDF and you build HT for nothing.
  • Uttar Pradesh's code prints two different figures on two pages, the original text and the amended one. The regulator's cost data book settles it. UP is also the one state with a real relaxation: an EV connection above the ceiling may be released on LT on request, at your cost, if the DISCOM finds it feasible. It is discretionary, so plan for HT and ask.
  • Maharashtra caps the whole premises, not just you. Inside a mall, a plaza or a housing society the limit is cumulative. A charger that would be LT on its own plot can tip a shared building over.
  • Delhi lets you choose between LT and HT across its middle band, which is an option to weigh, not a verdict. But an LT connection in the upper part of that band must still provide space for a transformer.
  • Karnataka asks for HT-class metering on LT connections well below its ceiling. Still LT, but not the simple job the headline figure suggests.

kW, kVA and the number on the form

A charger is sold by its output in kW. The DISCOM sanctions load at the input, in kW or kVA, and the two are not the same: once losses and power factor are counted, a charger draws more from the grid than it delivers to the car. Some states also key the ceiling to recorded maximum demand rather than sanctioned load, which matters on a site with load management, where two guns never draw their full sum at once. Each charger's product page states the supply it needs. The table above uses that figure, not the output, to say what fits.

What we would do

Buy to the ceiling, not through it. Up to 150 kW, apply for a separate EV connection and ask for LT under the national guideline, whatever your state's general ceiling. If the DISCOM refuses, a single-gun charger under the state ceiling can be live in weeks while the dual-gun unit you wanted waits on a transformer, so put the first one in and let it earn while the HT application runs. In a generous state, use the room: a dual-gun charger on LT serves two mass-market cars at full rate with no transformer at all. Go HT without regret where the traffic justifies two or more big guns, on a highway or at a depot, and have the load for the second phase sanctioned at the same time.

Whatever the state, do not design from a number someone remembers. Read the code, or let us: the site study checks the connection on day one, and the proposal names the voltage, the load and the DISCOM paperwork before anyone orders steel. If you are still deciding which charger class the cars in your area can use, start with what each car takes from a DC charger.

Frequently asked questions

Is there a national LT limit for EV chargers in India?

For a charging station on its own connection, yes: the Ministry of Power's 2024 guidelines tell DISCOMs to provide LT up to 150 kW. For everything else, each state regulator sets the LT ceiling in its supply code, and those differ about four-fold between states.

Does a 120 kW DC charger always need an HT connection?

Not if you apply for a separate connection for the station. The Ministry of Power's 2024 guidelines tell DISCOMs to give an LT connection up to 150 kW for a charging station on its own connection. Without that, it depends on the state: Delhi, Maharashtra and Karnataka allow it on LT, while Haryana, Uttar Pradesh and Rajasthan have lower general ceilings.

What does the Ministry of Power say about LT connections for charging stations?

Clause 5(3) of its 2024 guidelines says the DISCOM must provide an LT connection up to 150 kW for a charging station, provided a separate LT connection is applied for. Cite the clause in the application, because not every state supply code has been amended to match.

What does an HT connection add to a charging station?

A transformer you own, an HT panel, a metering cubicle, civil work, an inspection by the electrical inspectorate, and the space for all of it. Weeks become months. The site proposal costs it for your plot.

Can I run two DC chargers on one LT connection?

Yes, if their combined supply need stays under the ceiling. Some states count the recorded maximum demand rather than the sum of the nameplates, which load management can keep down.

Who applies to the DISCOM for the connection?

The site owner, as the consumer. We prepare the load calculation, the single-line diagram and the forms as part of the proposal, and our engineers handle the DISCOM's feasibility visit.

Why does the table not show my DISCOM?

We publish a ceiling only after reading the regulation it comes from. Ask us for yours and we will verify it and add it to the table.

Contents

    Link copied!
    Live from our DISCOM reference

    How much a DC station can take on an ordinary LT connection, state by state

    We have verified the LT ceiling for 75 DISCOMs across 35 states, from the regulation itself. It runs from 22 kW (Department of Power, Nagaland) to 200 kW (Tata Power Delhi Distribution). 3 more DISCOMs on our list are not yet verified and are not shown. Above the ceiling the connection is HT: your own transformer, metering and inspection.

    List as of 17 October 2026. These are each state's general LT ceilings. For a charging station on its own connection, the Ministry of Power's 2024 guidelines tell every DISCOM to give LT up to 150 kW. Ceilings are design thresholds, not promises: a DISCOM can supply at a different voltage on technical grounds. Each row links to the supply code, schedule or gazette it was read from.
    DISCOM LT up to Fits on LT Where it says so
    Andaman and Nicobar Islands
    Electricity Department, Andaman and Nicobar100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. 90 kW Nova 60 JERC (Electricity Supply Code) Regulations, 2018, Table 1 under Reg 4.3 as substituted by JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 — Regulation 4.3, Table 1 (Standard Voltage of Supply), item A(a)-(c); Reg 4.6, p. 3rd Amendment PDF page 7 (English text); principal Regulations PDF page 9 (Gazette p. 94) (Aug 2024)
    Andhra Pradesh
    Central Power Distribution Company of APNew connections above 75 kW / 100 HP get HT metering; 75–150 kW may opt LT or HT. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits it to 5 kW. 75 kW Nova 60 APERC Order on Tariff for Retail Sale of Electricity during FY 2026-27 (Chapter XI Terms and Conditions, Part A LT) [primary for the 5 kW rule]; also APERC General Terms and Conditions of Supply (GTCS), consolidated as on 13-04-2018, clause 3.2.1 — RST Order FY2026-27 Chapter XI, Part A, 1. LT Tariffs - Terms and Conditions, items (i)-(iii); GTCS clause 3.2.1, p. RST Order: printed page 175 (PDF … (Mar 2026)
    Eastern Power Distribution Company of APNew connections above 75 kW / 100 HP get HT metering; 75–150 kW may opt LT or HT. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits it to 5 kW. 75 kW Nova 60 APERC Order on Tariff for Retail Sale of Electricity during FY 2026-27 (Chapter XI Terms and Conditions, Part A LT) [primary for the 5 kW rule]; also APERC General Terms and Conditions of Supply (GTCS), consolidated as on 13-04-2018, clause 3.2.1 — RST Order FY2026-27 Chapter XI, Part A, 1. LT Tariffs - Terms and Conditions, items (i)-(iii); GTCS clause 3.2.1, p. RST Order: printed page 175 (PDF … (Mar 2026)
    Southern Power Distribution Company of APNew connections above 75 kW / 100 HP get HT metering; 75–150 kW may opt LT or HT. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits it to 5 kW. 75 kW Nova 60 APERC Order on Tariff for Retail Sale of Electricity during FY 2026-27 (Chapter XI Terms and Conditions, Part A LT) [primary for the 5 kW rule]; also APERC General Terms and Conditions of Supply (GTCS), consolidated as on 13-04-2018, clause 3.2.1 — RST Order FY2026-27 Chapter XI, Part A, 1. LT Tariffs - Terms and Conditions, items (i)-(iii); GTCS clause 3.2.1, p. RST Order: printed page 175 (PDF … (Mar 2026)
    Arunachal Pradesh
    Department of Power, Arunachal PradeshSingle-phase EV chargers are capped at 3.3 kW. 50 kW Navigator 30 Arunachal Pradesh State Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2024 (Arunachal Pradesh Gazette Extraordinary No. 138, Vol. XXXI, 11 Mar 2024; Notification No. APSERC/NOTIFICATION/38/2024 dated 6 Mar 2024; repeals Supply Code 2020) — Regulation 2.4(1), Table 1: Category of Supply; Regulation 2.4(2) (EV charging outlets), p. PDF/gazette page 10 (Mar 2024)
    Bihar
    North Bihar Power Distribution CompanyHT may start from 50 kVA. 70 kW Nova 60 Bihar Electricity Supply Code, 2007 - clause 3.4 as substituted by Bihar Electricity Supply Code (6th Amendment), 2020 — 3.4, p. 6th Amendment PDF p.2 (consolidated code PDF p.13 for 5th-amendment text) (Mar 2020)
    South Bihar Power Distribution CompanyHT may start from 50 kVA. 70 kW Nova 60 Bihar Electricity Supply Code, 2007 - clause 3.4 as substituted by Bihar Electricity Supply Code (6th Amendment), 2020 — 3.4, p. 6th Amendment PDF p.2 (consolidated code PDF p.13 for 5th-amendment text) (Mar 2020)
    Chandigarh
    Chandigarh Power Distribution100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. 90 kW Nova 60 JERC (State of Goa and UTs) (Electricity Supply Code) Regulations, 2018 (JERC:23/2018) as amended by (Third Amendment) Regulations, 2024 — Regulation 4.3, Table 1 (substituted by Third Amendment 2024, para 3(i)) and text following Table 1, p. 2018 Gazette p.94-95 (PDF p.9-10); Third Amendment Gazette p.7 (Aug 2024)
    Chhattisgarh
    Chhattisgarh State Power Distribution Company150 kW / 200 HP contract demand. 150 kW Nova 120 Chhattisgarh State Electricity Supply Code (Fifth Amendment), 2025, Notification No. 112/CSERC/2025, substituting Code 3.4 of the Chhattisgarh State Electricity Supply Code, 2011 — Code 3.4 (as substituted by Fifth Amendment 2025, para 2); footnote '*' and provisos as in Third Amendment 2023 / CSERC consolidated code; Code 4.1(e)(v), p. Fifth Amendment PDF p.3 (English); CSERC Consolidated Supply … (Aug 2025)
    Dadra and Nagar Haveli and Daman and Diu
    DNH and DD Power Distribution Corporation100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. 90 kW Nova 60 JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 (No. JERC-23/2018) substituting Table 1 under Reg. 4.3 of the JERC (Electricity Supply Code) Regulations, 2018 — Regulation 4.3, Table 1 (as substituted by Third Amendment 2024, para 3(i)); principal Code Reg. 4.3 text and provisos, p. Third Amendment: Gazette PDF p.7; principal Code 2018: PDF p.9-10 (Gazette pp.94-95) (Aug 2024)
    Delhi
    BSES Rajdhani Power200 kW / 215 kVA. Between 100 kW and 200 kW the consumer CHOOSES LT or HT (Clause 2) — present it as an option, not a verdict. An LT connection above 100 kW / 108 kVA must still provide transformer space. 200 kW Nova 180 DERC Schedule of Charges under the Supply Code 2017, Clause 1 (F.17(85)/Engg./DERC/2017-18/5767) (Aug 2017)
    BSES Yamuna Power200 kW / 215 kVA; 100–200 kW is the consumer's choice of LT or HT. 200 kW Nova 180 DERC Schedule of Charges under the Supply Code 2017, Clause 1 (Aug 2017)
    New Delhi Municipal Council (Electricity)200 kW / 215 kVA; 100–200 kW the applicant may choose LT or HT. 200 kW Nova 180 DERC Order: Schedule of Charges and the Procedure under DERC (Supply Code and Performance Standards) Regulations, 2017 (Principal Order) read with Schedule of Charges and the Procedure (Second Amendment) Order, 2018 — Schedule of Charges Order, Clause 1(1) and 1(2); Second Amendment Order 2018, para 2.0(1), p. Principal Order p.1-2 of 58; Second Amendment Order p.1 (Aug 2017)
    Tata Power Delhi Distribution200 kW / 215 kVA; 100–200 kW is the consumer's choice of LT or HT. 200 kW Nova 180 DERC Schedule of Charges under the Supply Code 2017, Clause 1 (Aug 2017)
    Goa
    Goa Electricity Department100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. 90 kW Nova 60 JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 (No. JERC-23/2018) substituting Table 1 under Reg. 4.3 of the JERC (Electricity Supply Code) Regulations, 2018 — Regulation 4.3, Table 1 (as substituted by Third Amendment 2024, para 3(i)); principal Code Reg. 4.3 text and provisos, p. Third Amendment: Gazette PDF p.7; principal Code 2018: PDF p.9-10 (Gazette pp.94-95) (Aug 2024)
    Gujarat
    Dakshin Gujarat Vij CompanyPrinted as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. 90 kW Nova 60 GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024)
    GIFT Power Company (GIFT City)Printed as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. 90 kW Nova 60 GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024)
    Madhya Gujarat Vij CompanyPrinted as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. 90 kW Nova 60 GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024)
    Paschim Gujarat Vij CompanyPrinted as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. 90 kW Nova 60 GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024)
    Torrent Power (Ahmedabad, Gandhinagar, Surat, Dahej)Printed as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. 90 kW Nova 60 GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024)
    Uttar Gujarat Vij CompanyPrinted as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. 90 kW Nova 60 GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024)
    Haryana
    Dakshin Haryana Bijli Vitran NigamSame code as UHBVN. Old sales-manual pages still showing 70 kW refer to the grandfathering band, not to new connections. 50 kW Navigator 30 HERC Electricity Supply Code (HERC/29/2014) Reg. 3.2.1, reproduced in DHBVN Sales Circular D-12/2014 (Jan 2014)
    Uttar Haryana Bijli Vitran NigamExisting LT connections between 50 and 70 kW are grandfathered until converted; a NEW connection is capped at 50 kW. 50 kW Navigator 30 HERC Electricity Supply Code (HERC/29/2014) Reg. 3.2.1, reproduced in UHBVN Sales Circular U-02/2020 (Jan 2014)
    Himachal Pradesh
    Himachal Pradesh State Electricity Board 50 kW Navigator 30 Himachal Pradesh Electricity Supply Code, 2009 as amended by the Himachal Pradesh Electricity Supply (Sixth Amendment) Code, 2025 (Notification No. HPERC/Supply Code/438) — Para 2.1.6.1(A)(a) table and provisos (as substituted by Sixth Amendment, para 4), p. Sixth Amendment p.2-3 (Mar 2025)
    Jammu and Kashmir
    Jammu Power Distribution Corporation100 kVA (90 kW at 0.9). Read from an Internet Archive copy of the gazette; the regulator site was unreachable. 90 kW Nova 60 JERC for the UT of Jammu & Kashmir and the UT of Ladakh (Electricity Supply Code) Regulations, 2023 (No. JERC-JKL/Reg/2023/06) — Regulation 4.3 (Classification of Supply) table and following text, p. Gazette p.84-86 (Mar 2023)
    Kashmir Power Distribution Corporation100 kVA (90 kW at 0.9). Read from an Internet Archive copy of the gazette; the regulator site was unreachable. 90 kW Nova 60 JERC for the UT of Jammu & Kashmir and the UT of Ladakh (Electricity Supply Code) Regulations, 2023 (No. JERC-JKL/Reg/2023/06) — Regulation 4.3 (Classification of Supply) table and following text, p. Gazette p.84-86 (Mar 2023)
    Jharkhand
    Jharkhand Bijli Vitran Nigam85 kW / 100 kVA. 85 kW Nova 60 JSERC (Electricity Supply Code) Regulations, 2015, as amended by First Amendment 2018 and Second Amendment 2024 — 4.3, 4.7, p. PDF pp.12-13 (Sep 2015)
    Tata Steel Utilities and Infrastructure Services (Jamshedpur)85 kW / 100 kVA. 85 kW Nova 60 JSERC (Electricity Supply Code) Regulations, 2015, as amended by First Amendment 2018 and Second Amendment 2024 — 4.3, 4.7, p. PDF pp.12-13 (Sep 2015)
    Karnataka
    Bangalore Electricity Supply Company150 kW / 201 HP / 176 kVA. KERC's consolidated CoS PDF is a 2013 print still showing the superseded 50 kW — three times too low. Exactly 150.0 kW is ambiguous between "inclusive" and "less than" across documents; confirm. An LT connection above 50 kW needs HT-class metering. Temporary supply is capped at 50 kW. 150 kW Nova 120 Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020)
    Chamundeshwari Electricity Supply Corporation (Mysuru)150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. 150 kW Nova 120 Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020)
    Gulbarga Electricity Supply Company150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. 150 kW Nova 120 Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020)
    Hubli Electricity Supply Company150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. 150 kW Nova 120 Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020)
    Hukeri Rural Electric Co-operative Society150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. 150 kW Nova 120 Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020)
    Mangalore Electricity Supply Company150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. 150 kW Nova 120 Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020)
    Kerala
    Kannan Devan Hills Plantations Company (Munnar)100 kW connected load, or 100 kVA (90 kW at 0.9) contract demand. Domestic EV chargers above 3.3 kW must be three phase. 90 kW Nova 60 Kerala Electricity Supply Code, 2014 [KSERC consolidated, 'Updated as on 14-10-2025'] - Regulation 8 table as substituted by Kerala Electricity Supply (Fifth Amendment) Code, 2024 — Regulation 8 (supply voltages for connected loads/contract demands); Regs 8A, 11, 90A, p. Reg 8: PDF page 16; Reg 8A: p.17-18; Reg 11: p.19-21; Reg 90A: p.81-82 (Jan 2014)
    Kerala State Electricity Board100 kW connected load, or 100 kVA (90 kW at 0.9) contract demand. Domestic EV chargers above 3.3 kW must be three phase. 90 kW Nova 60 Kerala Electricity Supply Code, 2014 [KSERC consolidated, 'Updated as on 14-10-2025'] - Regulation 8 table as substituted by Kerala Electricity Supply (Fifth Amendment) Code, 2024 — Regulation 8 (supply voltages for connected loads/contract demands); Regs 8A, 11, 90A, p. Reg 8: PDF page 16; Reg 8A: p.17-18; Reg 11: p.19-21; Reg 90A: p.81-82 (Jan 2014)
    Thrissur Corporation Electricity Department100 kW connected load, or 100 kVA (90 kW at 0.9) contract demand. Domestic EV chargers above 3.3 kW must be three phase. 90 kW Nova 60 Kerala Electricity Supply Code, 2014 [KSERC consolidated, 'Updated as on 14-10-2025'] - Regulation 8 table as substituted by Kerala Electricity Supply (Fifth Amendment) Code, 2024 — Regulation 8 (supply voltages for connected loads/contract demands); Regs 8A, 11, 90A, p. Reg 8: PDF page 16; Reg 8A: p.17-18; Reg 11: p.19-21; Reg 90A: p.81-82 (Jan 2014)
    Ladakh
    Ladakh Power Development Department100 kVA (90 kW at 0.9). Read from an Internet Archive copy of the gazette; the regulator site was unreachable. 90 kW Nova 60 JERC for the UT of Jammu & Kashmir and the UT of Ladakh (Electricity Supply Code) Regulations, 2023 (No. JERC-JKL/Reg/2023/06) — Regulation 4.3 (Classification of Supply) table and following text, p. Gazette p.84-86 (Mar 2023)
    Lakshadweep
    Electricity Department, Lakshadweep100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. 90 kW Nova 60 JERC (Electricity Supply Code) Regulations, 2018 - Table 1 under Reg 4.3 as substituted by JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 — Regulation 4.3, Table 1: Standard Voltage of Supply (as substituted by Reg 3(i) of Third Amendment 2024); Regs 4.3 provisos and 4.6 of Principal Regulations, p. Third Amendment: PDF page 7; Principal 2018: PDF pages 9-10 (Gazette pp. 94-95) (Aug 2024)
    Madhya Pradesh
    MP Madhya Kshetra Vidyut Vitaran Company (Bhopal) 150 kW Nova 120 Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025], MPERC Notification No. 570/MPERC/2025, substituting Regulation 3.4 of the MP Electricity Supply Code, 2021 [RG-1(II) of 2021] — Regulation 3.4 (as substituted w.e.f. 28.03.2025); Reg. 3.2(a) declared LT voltages, p. Fifth Amendment PDF p.2 of 7; MPERC Compendium v1.2.6 (updated 18/09/2026) PDF p.9 (printed p.8) (Mar 2025)
    MP Paschim Kshetra Vidyut Vitaran Company (Indore) 150 kW Nova 120 Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025], MPERC Notification No. 570/MPERC/2025, substituting Regulation 3.4 of the MP Electricity Supply Code, 2021 [RG-1(II) of 2021] — Regulation 3.4 (as substituted w.e.f. 28.03.2025); Reg. 3.2(a) declared LT voltages, p. Fifth Amendment PDF p.2 of 7; MPERC Compendium v1.2.6 (updated 18/09/2026) PDF p.9 (printed p.8) (Mar 2025)
    MP Poorv Kshetra Vidyut Vitaran Company (Jabalpur) 150 kW Nova 120 Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025], MPERC Notification No. 570/MPERC/2025, substituting Regulation 3.4 of the MP Electricity Supply Code, 2021 [RG-1(II) of 2021] — Regulation 3.4 (as substituted w.e.f. 28.03.2025); Reg. 3.2(a) declared LT voltages, p. Fifth Amendment PDF p.2 of 7; MPERC Compendium v1.2.6 (updated 18/09/2026) PDF p.9 (printed p.8) (Mar 2025)
    Maharashtra
    Adani Electricity Mumbai160 kW / 200 kVA; 480 kW / 600 kVA for several consumers in one building. 160 kW Nova 120 MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 (No. MERC/Legal/2021/66) — Regulation 3.2(a) and 3.2(b), with first proviso after 3.2(f), p. PDF p.10 of 80 (Reg. 3 heading on p.9) (Feb 2021)
    BEST Undertaking (Mumbai island city)160 kW / 200 kVA; 480 kW / 600 kVA for several consumers in one building. 160 kW Nova 120 MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 (No. MERC/Legal/2021/66) — Regulation 3.2(a) and 3.2(b), with first proviso after 3.2(f), p. PDF p.10 of 80 (Reg. 3 heading on p.9) (Feb 2021)
    Maharashtra State Electricity Distribution160 kW / 200 kVA for a single consumer. IN SHARED PREMISES (a mall, plaza or society) the cumulative limit is 480 kW / 600 kVA — a real trap for EV sites inside larger developments. 160 kW Nova 120 MERC Supply Code and SoP Regulations 2021, Reg. 3.2(b) (Feb 2021)
    Tata Power (Mumbai distribution)160 kW / 200 kVA; 480 kW / 600 kVA for several consumers in one building. 160 kW Nova 120 MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 (No. MERC/Legal/2021/66) — Regulation 3.2(a) and 3.2(b), with first proviso after 3.2(f), p. PDF p.10 of 80 (Reg. 3 heading on p.9) (Feb 2021)
    Manipur
    Manipur State Power Distribution Company 50 kW Navigator 30 Joint Electricity Regulatory Commission for Manipur and Mizoram (Electricity Supply Code) Regulations, 2013, consolidated 'with amendment upto 9 July 2019', as adopted by MnERC; First Amendment 2014 (15 Oct 2014) and Fifth Amendment 2016 (10 Oct 2016) also read; MnERC Nineteenth Amendment 2026 (Manipur Gazette Extraordinary No. 32, 12 May 2026) checked — Regulation 3.2, Table 1: Classification of … (Oct 2014)
    Meghalaya
    Meghalaya Power Distribution Corporation 50 kW Navigator 30 Meghalaya State Electricity Regulatory Commission (Electricity Supply Code) (1 of 2026) Regulations, 2026 (Notification MSERC/ESC/2024/16 dated 22 Apr 2026; supersedes MSERC Supply Code Regulations 2018) — Regulation 2.2.1 (Supply voltage for different connected loads) and 2.2.4, p. PDF page 24 of 145 (Apr 2026)
    Mizoram
    Power and Electricity Department, Mizoram 50 kW Navigator 30 The Mizoram Electricity Regulatory Commission (Electricity Supply Code) Regulations 2026 (Notification T.16014/1/2024-MZERC/59 dated 29 Apr 2026; Mizoram Gazette Ex-376/2026) — Regulation 5.2 (Classification of Supply) and 5.5, p. PDF page 19 (Apr 2026)
    Nagaland
    Department of Power, Nagaland25 kVA connected load (22.5 kW at 0.9); 50 kVA with the consumer's own transformer. 22 kW HT for any DC charger Nagaland Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2012 (Notification No. NERC/REGN/2012(A) dated 9 May 2012) — Regulation 2.2 (Voltage of Supply to Consumers), p. n/a (MS Word .doc published by NERC; no fixed pagination) (May 2012)
    Odisha
    TP Central Odisha Distribution (Bhubaneswar, Cuttack)70 kVA (63 kW at 0.9). A July 2025 draft code proposes 150 kW; not notified as of 17.10.2026. 63 kW Navigator 30 OERC Distribution (Conditions of Supply) Code, 2019 — Regulation 134(I), Sl. 1(a) and 1(c); Sl. 2(a), p. 52 (Aug 2019)
    TP Northern Odisha Distribution (Balasore)70 kVA (63 kW at 0.9). A July 2025 draft code proposes 150 kW; not notified as of 17.10.2026. 63 kW Navigator 30 OERC Distribution (Conditions of Supply) Code, 2019 — Regulation 134(I), Sl. 1(a) and 1(c); Sl. 2(a), p. 52 (Aug 2019)
    TP Southern Odisha Distribution (Berhampur)70 kVA (63 kW at 0.9). A July 2025 draft code proposes 150 kW; not notified as of 17.10.2026. 63 kW Navigator 30 OERC Distribution (Conditions of Supply) Code, 2019 — Regulation 134(I), Sl. 1(a) and 1(c); Sl. 2(a), p. 52 (Aug 2019)
    TP Western Odisha Distribution (Sambalpur)70 kVA (63 kW at 0.9). A July 2025 draft code proposes 150 kW; not notified as of 17.10.2026. 63 kW Navigator 30 OERC Distribution (Conditions of Supply) Code, 2019 — Regulation 134(I), Sl. 1(a) and 1(c); Sl. 2(a), p. 52 (Aug 2019)
    Puducherry
    Electricity Department, Puducherry100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. 90 kW Nova 60 JERC (Electricity Supply Code) Regulations, 2018 - Table 1 under Reg 4.3 as substituted by JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 — Regulation 4.3, Table 1: Standard Voltage of Supply (as substituted by Reg 3(i) of Third Amendment 2024); Regs 4.3 provisos and 4.6 of Principal Regulations, p. Third Amendment: PDF page 7; Principal 2018: PDF pages 9-10 (Gazette pp. 94-95) (Aug 2024)
    Punjab
    Punjab State Power CorporationThe code states 100 kVA; 95 kW is that at the code's own PF 0.95. Taking LT where a higher voltage is specified attracts a 15% energy surcharge. 95 kW Nova 60 PSERC Supply Code 2024 Reg. 5(2) (Notification PSERC/Secy./Regu.191, in force 14.11.2024) (Oct 2024)
    Rajasthan
    Ajmer Vidyut Vitran Nigam50 kVA (45 kW at 0.9). 45 kW Navigator 30 RERC (Electricity Supply Code and Connected Matters) Regulations, 2021 (Reg. 139), as amended by First Amendment 2023, Second Amendment 2025 and Third Amendment 2026 — Reg. 4.1(a)(i)-(iii), 4.2, 4.3, 4.5 (as substituted 2023), p. Gazette PDF pp.143-146 (printed 527-530); 1st Amendment PDF pp.8-9 (Feb 2021)
    Jaipur Vidyut Vitran NigamThe schedules state 50 kVA; 45 kW is that at PF 0.90. Changeover to HT is triggered once recorded maximum demand exceeds 50 kVA more than twice in a financial year. 45 kW Navigator 30 RERC Supply Code 2021 Reg. 4.1; JVVNL Tariff 2024 schedule EV/LT-8 (Aug 2024)
    Jodhpur Vidyut Vitran Nigam50 kVA (45 kW at 0.9). 45 kW Navigator 30 RERC (Electricity Supply Code and Connected Matters) Regulations, 2021 (Reg. 139), as amended by First Amendment 2023, Second Amendment 2025 and Third Amendment 2026 — Reg. 4.1(a)(i)-(iii), 4.2, 4.3, 4.5 (as substituted 2023), p. Gazette PDF pp.143-146 (printed 527-530); 1st Amendment PDF pp.8-9 (Feb 2021)
    Sikkim
    Energy and Power Department, Sikkim25 kVA connected load (22.5 kW at 0.9); 50 kVA with the consumer's own transformer. 22 kW HT for any DC charger Sikkim State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2012 — Regulation 2.2(iv)(a)-(c), p. 10 (Apr 2012)
    Tamil Nadu
    Tamil Nadu Power Distribution Corporation (TANGEDCO)Up to 150 kW, but 112–150 kW only if the consumer gives transformer space. 112 kW Nova 60 Tamil Nadu Electricity Distribution Code (As amended upto 31-03-2024) [TNERC consolidated] — Regulation 26(1)(a)-(c) 'Categories of Supply' (and 26(2)-(3)), p. PDF pages 26-28 (Jun 2020)
    Telangana
    Co-operative Electric Supply Society, Sircilla56 kW / 75 HP; EV charging stations up to 150 kW. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits domestic to 5 kW. 56 kW Navigator 30 TGERC Order on Revised ARR & Retail Supply Tariffs for FY 2026-27 (Chapter 4 Terms and Conditions of Tariff) [primary for 5 kW rule]; also GTCS clause 3.2.1 as substituted by APERC Proceeding No.APERC/Secy/96/2014 dt 31-05-2014 (adopted in Telangana by TSERC Regulation No.1 of 2014) — RST Order FY2026-27 clause 4.11.1(b) and 4.1.3; GTCS clause 3.2.1, p. RST Order: 4.1.3 printed p.246 (PDF p.258); … (Mar 2026)
    Northern Power Distribution Company of Telangana (Warangal)56 kW / 75 HP; EV charging stations up to 150 kW. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits domestic to 5 kW. 56 kW Navigator 30 TGERC Order on Revised ARR & Retail Supply Tariffs for FY 2026-27 (Chapter 4 Terms and Conditions of Tariff) [primary for 5 kW rule]; also GTCS clause 3.2.1 as substituted by APERC Proceeding No.APERC/Secy/96/2014 dt 31-05-2014 (adopted in Telangana by TSERC Regulation No.1 of 2014) — RST Order FY2026-27 clause 4.11.1(b) and 4.1.3; GTCS clause 3.2.1, p. RST Order: 4.1.3 printed p.246 (PDF p.258); … (Mar 2026)
    Southern Power Distribution Company of Telangana (Hyderabad)56 kW / 75 HP; EV charging stations up to 150 kW. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits domestic to 5 kW. 56 kW Navigator 30 TGERC Order on Revised ARR & Retail Supply Tariffs for FY 2026-27 (Chapter 4 Terms and Conditions of Tariff) [primary for 5 kW rule]; also GTCS clause 3.2.1 as substituted by APERC Proceeding No.APERC/Secy/96/2014 dt 31-05-2014 (adopted in Telangana by TSERC Regulation No.1 of 2014) — RST Order FY2026-27 clause 4.11.1(b) and 4.1.3; GTCS clause 3.2.1, p. RST Order: 4.1.3 printed p.246 (PDF p.258); … (Mar 2026)
    Tripura
    Tripura State Electricity Corporation 150 kW Nova 120 TERC (Electricity Supply Code) Regulations, 2011 (Third Amendment), 2025 (No.F.25/TERC/2025/1477 dated 31 Jan 2026; Tripura Gazette Extraordinary No. 2026320, 25 Feb 2026), amending Reg 3.2 of TERC Electricity Supply Code Regulation 2011 (dated 17 Oct 2011; Tripura Gazette 13 Mar 2012) — Regulation 3.2 as substituted by para 2 of the Third Amendment (table internally numbered '5.3'); Regulation … (Jan 2026)
    Uttar Pradesh
    Dakshinanchal Vidyut Vitran Nigam (Agra)50 kW / 56 kVA. 50 kW Navigator 30 U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006)
    Kanpur Electricity Supply Company50 kW / 56 kVA. 50 kW Navigator 30 U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006)
    Madhyanchal Vidyut Vitran Nigam (Lucknow)50 kW / 56 kVA. 50 kW Navigator 30 U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006)
    Noida Power Company (Greater Noida)50 kW / 56 kVA. 50 kW Navigator 30 U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006)
    Paschimanchal Vidyut Vitran Nigam (Meerut, Noida, Ghaziabad)50 kW / 56 kVA. 50 kW Navigator 30 U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006)
    Purvanchal Vidyut Vitran Nigam (Varanasi)50 kW / 56 kVA. 50 kW Navigator 30 U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006)
    Uttar Pradesh Power Corporation50 kW / 56 kVA. Beware: the UPERC PDF prints the unamended 63 kVA on p.15 and the amended 56 kVA on p.255. The Cost Data Book prevails over the Code. 50 kW Navigator 30 UP Electricity Supply Code 2005 cl. 3.2 as amended (3rd Amendment, 11.08.2006); UPERC Cost Data Book 31.12.2025 Notes 13–14 (Aug 2006)
    Uttarakhand
    Uttarakhand Power Corporation400 V up to 25 kW; 25–75 kW / 88 kVA only through HVDS (a dedicated transformer). 25 kW HT for any DC charger UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 (No. F-9(31)/RG/UERC/2020/814) — Regulation 2.1(4), Table 2.1 and proviso, p. Gazette p.508-509 (English gazette PDF p.10-11, scanned) (Oct 2020)
    West Bengal
    CESC Limited (Kolkata)150 kVA / 127.50 kW per the same guideline. 127 kW Nova 60 Guidelines for LV (Single Phase) & MV (Three Phase) Application - for New Connection / Additional Load / Shifting of Supply equal to or below Notified Voltage (i.e. 650 Volts) (file gcsch.pdf, linked as 'Guidelines' from https://www.cesc.co.in/olnc) — 'Submission of Application' section, NOTE item 1, p. PDF page 2 (scanned image page; text read visually)
    West Bengal State Electricity Distribution Company200 kVA contract demand (180 kW at 0.9), raised from 125 kVA by WBERC order 03.12.2019. 180 kW Nova 120 WBSEDCL PROCEDURES-A (2010) - Procedures for effecting service connection in Low Voltage and Medium Voltage (LV&MV) by WBSEDCL (approved by WBERC order dated 31.12.2010 under Reg 13.13 of WBERC SOP Regulations 2010; LV&MV ceiling amended by WBERC order dated 03.12.2019 in Case OA-88/10-11/3) — Clause 2.2 (single phase); Clause 1.2 as modified by WBERC order 03.12.2019 para 17.0(i) (LV&MV … (Dec 2019)

    The table comes from the same DISCOM reference our survey engineers design against, and changes when it does. Your DISCOM not listed? Tell us at hello@zevpoint.com and we will verify it.