DC fast charging

From fleets to corporate offices, we power them all.

DC fast chargers from 30kW to 240kW+ — designed, installed and serviced across India.

7 years in EVProven, trusted partner
Pan-IndiaInstalled & serviced
Access & billingYour rules, your tariffs
Survey to serviceOne partner, end to end
Why Zevpoint

Everything about the site, handled by Zevpoint.

1 One team, start to finishSurvey, civil, electrical and charger — no vendors to coordinate.
24 h Proposal with drawingsAfter the site visit — layout, hardware and pricing, all drawn up.
2× Power without a rebuild60 → 120 kW and 180 → 240 kW in the same cabinet.
2 yr Warranty, serviced by usField-replaceable modules, support across India.
Every site type

From a café to a bus depot.

08 site types
Recommended charger —kW Charging time · 20 → 80% —min Average across electric cars charging from 20% to 80%. See this charger →
What kind of site is it?
How long does a vehicle stay?
How many vehicles a day?
No franchise, no lock-in

You don't need a franchise
to run a charging station.

A hotel, a dhaba, a society, a single parking bay — if you have the space, the station can be yours. We build it, run the software and service it.

What you never pay
Franchise feeRevenue shareBrand lock-inMinimum guarantee
What you get
The station sits on your books and earns on your balance sheet — not a head office's.
You set the tariff and decide who charges — public, private or member-only.
No commission on sessions, no cut of the revenue, no minimum to hit.
Hardware, install, software and service from us — and the site still works if you switch.
How it works

From a site visit to a working charger, we handle what's in between.

You see the full plan and the full cost before you spend anything. If it works for you, the same team builds it and stays on for service.

Day 0 Site study An engineer measures the plot, checks the supply and confirms access.
Within 24 hours Proposal Your station drawn on your plot, with costs and payback.
Week 1 Decision session 45 minutes with the engineer. Every change is costed before you decide.
Weeks 2–10 Build Approvals, transformer, civil work, cabling and installation.
Weeks 10–12 Go live Tested, connected and handed over. Listed on the apps, service starts.
Find your fit

Tell us about the site. We'll tell you what fits.

Three questions and a number. An engineer who knows your kind of site will call you back with a recommendation — the charger, the supply it needs and what the project looks like.

Would rather just talk? Talk to an expert →
Get a call back
I am a…
What kind of location is it?
Expected EV traffic?
Timeline to go live?
Where can we reach you?
Request a call back

We'll only use your details to contact you about this enquiry.