


03 · DC fast chargers, 30 to 240 kW
Power is only the beginning.
A DC charging platform built around modular power architecture, integrated control systems and connected operations.
One platform, scaled to your site.
Swap a module, not the unit.
Built around 30 kW power modules, selected configurations can scale within the same charger cabinet. As site demand grows, output is expanded by adding power modules instead of replacing the complete charger.
What is inside the cabinet.

Status you can read.
A 7-inch touchscreen guides the session, and RGB status lighting shows the charger state at a glance — available, connected, charging or faulted. An emergency stop stays within reach on the front panel.

Power grows, cabinet stays.
Selected configurations scale inside the same cabinet — 60 to 120 kW, or 180 to 240 kW. Add power modules as demand grows instead of replacing the charger.

Heat, damp and altitude.
Rated 0–55 °C and up to 95% non-condensing humidity, in an IP54 enclosure with forced-air cooling. Anti-condensation protection for demanding sites.
Pay how you already pay.
Runs on your platform.
OCPP 1.6 over Ethernet, 4G or Wi-Fi, so the charger reports into Zev Connect or any compatible management platform — with live telemetry, remote diagnostics and firmware updates over the air.
Protection built through the power path.
Current, voltage and surge are watched continuously — the charger backs off or stops before a fault reaches the vehicle.
Cabinet and cable temperature are sensed during every session, so a hot connector or a hot day derates power rather than risking it.
Ground-fault and insulation monitoring plus galvanic isolation keep the high-voltage side separated from anything a person can touch.
Serviced on site, anywhere in India.
We build the hardware, so we can fix it — no third-party vendor in the middle. Remote diagnostics catch most faults before you notice them, and a Zevpoint engineer reaches the rest on site.
01Survey & feasibility
Site visit, load study and a feasibility report before you commit.
02Installation
Civil work, cabling, connection and commissioning by our own team.
03Service & upkeep
Preventive maintenance, repairs and module swaps for the life of the site.
Start with the site, not the spec.
A single wall-mounted gun serves customer cars on your existing LT supply — no transformer, no new sanction.
Two guns on one cabinet clear the evening peak, with load sharing to protect the society's sanctioned demand.
Roughly 150 km added in twenty minutes, so a single bay serves guests and shoppers through the day.
A full charge in the length of a tea break, with a second gun so the next car never queues.
Turns a full fleet overnight, with scheduled charging that keeps the site inside its sanctioned demand.
Fits the twenty-minute gap between trips, with one dashboard showing which driver charged where.
A single wall-mounted gun serves customer cars on your existing LT supply — no transformer, no new sanction.
Two guns on one cabinet clear the evening peak, with load sharing to protect the society's sanctioned demand.
Roughly 150 km added in twenty minutes, so a single bay serves guests and shoppers through the day.
A full charge in the length of a tea break, with a second gun so the next car never queues.
Turns a full fleet overnight, with scheduled charging that keeps the site inside its sanctioned demand.
Fits the twenty-minute gap between trips, with one dashboard showing which driver charged where.
Compare all specifications
ARAI certified · OCPP 1.6 · IEC 61851-23, IEC 62196, IEC 61851-1 · 48-hour priority service
Real sites, real numbers.

Enterprise charging hub
A managed DC charging hub for one of India's largest operations.

Guests charge, hotel earns
EV charging that lifts bookings and guest experience at a Jaipur property.

Charging costs cut ~65%
A fleet slashed monthly charging spend with managed DC charging.
Not sure which charger? The site study decides it.
Your load, demand and plot decide it. Proposal with drawings in 24 hours.
An engineer visits your plot and measures it. You get the drawings and costs for your actual site, and with the Project report, the payback — so the decision is made on real numbers.