1 Choose
2 Details
3 Pay
Choose your report
They begin with an engineer visiting your site
Site survey
Layout & Cost estimate
What fits on your site and what it costs.
₹9,999 + 18% GST
Includes
✓Engineer site visitiPlot, access, power connection, cable route and ground, with photographs.
✓Site plan, front view, station viewiCharger positions, bays and cable routes, drawn to scale.
✓Single-line diagram, LT or HTiThe electrical connection for your supply.
✓Itemised cost estimateiLine by line, for the recommended setup.
Included:
✓Engineer site visit: plot, access, power connection, cable route, ground, photographs
✓Site plan with charger positions, bays and cable routes
✓Front view and station view
✓Single-line diagram; LT or HT connection
✓Bay section and canopy options
✓Itemised cost estimate for the recommended setup
Most complete
Project reportSurvey included
Site Survey + Project Report
Layout + Cost Estimate + numbers behind the decision.
₹19,999 + 18% GST
Everything in the site survey, plus
✓Charging intelligence for your locationiEV traffic and demand your location can serve.
✓Revenue, running cost and break-eveniThe investment and return, year by year.
✓Build schedule and risksiThe implementation plan and what could hold it up.
Everything in the site survey, plus:
✓All 6 site survey items
✓Charging intelligence: EV traffic and demand at your location
✓Transformer, cable and protection sizing against actual load
✓Investment and return: revenue, running cost, years to break even
✓Implementation schedule and risks
₹
Build with Zevpoint and this fee is adjusted in your project.