| Andaman and Nicobar Islands |
|---|
|
Electricity Department, Andaman and Nicobar100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. |
90 kW |
Nova 60 |
JERC (Electricity Supply Code) Regulations, 2018, Table 1 under Reg 4.3 as substituted by JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 — Regulation 4.3, Table 1 (Standard Voltage of Supply), item A(a)-(c); Reg 4.6, p. 3rd Amendment PDF page 7 (English text); principal Regulations PDF page 9 (Gazette p. 94) (Aug 2024) |
| Andhra Pradesh |
|---|
|
Central Power Distribution Company of APNew connections above 75 kW / 100 HP get HT metering; 75–150 kW may opt LT or HT. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits it to 5 kW. |
75 kW |
Nova 60 |
APERC Order on Tariff for Retail Sale of Electricity during FY 2026-27 (Chapter XI Terms and Conditions, Part A LT) [primary for the 5 kW rule]; also APERC General Terms and Conditions of Supply (GTCS), consolidated as on 13-04-2018, clause 3.2.1 — RST Order FY2026-27 Chapter XI, Part A, 1. LT Tariffs - Terms and Conditions, items (i)-(iii); GTCS clause 3.2.1, p. RST Order: printed page 175 (PDF … (Mar 2026) |
|
Eastern Power Distribution Company of APNew connections above 75 kW / 100 HP get HT metering; 75–150 kW may opt LT or HT. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits it to 5 kW. |
75 kW |
Nova 60 |
APERC Order on Tariff for Retail Sale of Electricity during FY 2026-27 (Chapter XI Terms and Conditions, Part A LT) [primary for the 5 kW rule]; also APERC General Terms and Conditions of Supply (GTCS), consolidated as on 13-04-2018, clause 3.2.1 — RST Order FY2026-27 Chapter XI, Part A, 1. LT Tariffs - Terms and Conditions, items (i)-(iii); GTCS clause 3.2.1, p. RST Order: printed page 175 (PDF … (Mar 2026) |
|
Southern Power Distribution Company of APNew connections above 75 kW / 100 HP get HT metering; 75–150 kW may opt LT or HT. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits it to 5 kW. |
75 kW |
Nova 60 |
APERC Order on Tariff for Retail Sale of Electricity during FY 2026-27 (Chapter XI Terms and Conditions, Part A LT) [primary for the 5 kW rule]; also APERC General Terms and Conditions of Supply (GTCS), consolidated as on 13-04-2018, clause 3.2.1 — RST Order FY2026-27 Chapter XI, Part A, 1. LT Tariffs - Terms and Conditions, items (i)-(iii); GTCS clause 3.2.1, p. RST Order: printed page 175 (PDF … (Mar 2026) |
| Arunachal Pradesh |
|---|
|
Department of Power, Arunachal PradeshSingle-phase EV chargers are capped at 3.3 kW. |
50 kW |
Navigator 30 |
Arunachal Pradesh State Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2024 (Arunachal Pradesh Gazette Extraordinary No. 138, Vol. XXXI, 11 Mar 2024; Notification No. APSERC/NOTIFICATION/38/2024 dated 6 Mar 2024; repeals Supply Code 2020) — Regulation 2.4(1), Table 1: Category of Supply; Regulation 2.4(2) (EV charging outlets), p. PDF/gazette page 10 (Mar 2024) |
| Bihar |
|---|
|
North Bihar Power Distribution CompanyHT may start from 50 kVA. |
70 kW |
Nova 60 |
Bihar Electricity Supply Code, 2007 - clause 3.4 as substituted by Bihar Electricity Supply Code (6th Amendment), 2020 — 3.4, p. 6th Amendment PDF p.2 (consolidated code PDF p.13 for 5th-amendment text) (Mar 2020) |
|
South Bihar Power Distribution CompanyHT may start from 50 kVA. |
70 kW |
Nova 60 |
Bihar Electricity Supply Code, 2007 - clause 3.4 as substituted by Bihar Electricity Supply Code (6th Amendment), 2020 — 3.4, p. 6th Amendment PDF p.2 (consolidated code PDF p.13 for 5th-amendment text) (Mar 2020) |
| Chandigarh |
|---|
|
Chandigarh Power Distribution100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. |
90 kW |
Nova 60 |
JERC (State of Goa and UTs) (Electricity Supply Code) Regulations, 2018 (JERC:23/2018) as amended by (Third Amendment) Regulations, 2024 — Regulation 4.3, Table 1 (substituted by Third Amendment 2024, para 3(i)) and text following Table 1, p. 2018 Gazette p.94-95 (PDF p.9-10); Third Amendment Gazette p.7 (Aug 2024) |
| Chhattisgarh |
|---|
|
Chhattisgarh State Power Distribution Company150 kW / 200 HP contract demand. |
150 kW |
Nova 120 |
Chhattisgarh State Electricity Supply Code (Fifth Amendment), 2025, Notification No. 112/CSERC/2025, substituting Code 3.4 of the Chhattisgarh State Electricity Supply Code, 2011 — Code 3.4 (as substituted by Fifth Amendment 2025, para 2); footnote '*' and provisos as in Third Amendment 2023 / CSERC consolidated code; Code 4.1(e)(v), p. Fifth Amendment PDF p.3 (English); CSERC Consolidated Supply … (Aug 2025) |
| Dadra and Nagar Haveli and Daman and Diu |
|---|
|
DNH and DD Power Distribution Corporation100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. |
90 kW |
Nova 60 |
JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 (No. JERC-23/2018) substituting Table 1 under Reg. 4.3 of the JERC (Electricity Supply Code) Regulations, 2018 — Regulation 4.3, Table 1 (as substituted by Third Amendment 2024, para 3(i)); principal Code Reg. 4.3 text and provisos, p. Third Amendment: Gazette PDF p.7; principal Code 2018: PDF p.9-10 (Gazette pp.94-95) (Aug 2024) |
| Delhi |
|---|
|
BSES Rajdhani Power200 kW / 215 kVA. Between 100 kW and 200 kW the consumer CHOOSES LT or HT (Clause 2) — present it as an option, not a verdict. An LT connection above 100 kW / 108 kVA must still provide transformer space. |
200 kW |
Nova 180 |
DERC Schedule of Charges under the Supply Code 2017, Clause 1 (F.17(85)/Engg./DERC/2017-18/5767) (Aug 2017) |
|
BSES Yamuna Power200 kW / 215 kVA; 100–200 kW is the consumer's choice of LT or HT. |
200 kW |
Nova 180 |
DERC Schedule of Charges under the Supply Code 2017, Clause 1 (Aug 2017) |
|
New Delhi Municipal Council (Electricity)200 kW / 215 kVA; 100–200 kW the applicant may choose LT or HT. |
200 kW |
Nova 180 |
DERC Order: Schedule of Charges and the Procedure under DERC (Supply Code and Performance Standards) Regulations, 2017 (Principal Order) read with Schedule of Charges and the Procedure (Second Amendment) Order, 2018 — Schedule of Charges Order, Clause 1(1) and 1(2); Second Amendment Order 2018, para 2.0(1), p. Principal Order p.1-2 of 58; Second Amendment Order p.1 (Aug 2017) |
|
Tata Power Delhi Distribution200 kW / 215 kVA; 100–200 kW is the consumer's choice of LT or HT. |
200 kW |
Nova 180 |
DERC Schedule of Charges under the Supply Code 2017, Clause 1 (Aug 2017) |
| Goa |
|---|
|
Goa Electricity Department100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. |
90 kW |
Nova 60 |
JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 (No. JERC-23/2018) substituting Table 1 under Reg. 4.3 of the JERC (Electricity Supply Code) Regulations, 2018 — Regulation 4.3, Table 1 (as substituted by Third Amendment 2024, para 3(i)); principal Code Reg. 4.3 text and provisos, p. Third Amendment: Gazette PDF p.7; principal Code 2018: PDF p.9-10 (Gazette pp.94-95) (Aug 2024) |
| Gujarat |
|---|
|
Dakshin Gujarat Vij CompanyPrinted as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. |
90 kW |
Nova 60 |
GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024) |
|
GIFT Power Company (GIFT City)Printed as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. |
90 kW |
Nova 60 |
GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024) |
|
Madhya Gujarat Vij CompanyPrinted as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. |
90 kW |
Nova 60 |
GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024) |
|
Paschim Gujarat Vij CompanyPrinted as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. |
90 kW |
Nova 60 |
GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024) |
|
Torrent Power (Ahmedabad, Gandhinagar, Surat, Dahej)Printed as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. |
90 kW |
Nova 60 |
GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024) |
|
Uttar Gujarat Vij CompanyPrinted as 100 kVA/kW of contracted demand (150 if the consumer opts); 90 kW is 100 kVA at 0.9. |
90 kW |
Nova 60 |
GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024, Notification No. 14 of 2024 (substituting clause 3.2 of the Supply Code, Notification No. 4 of 2015) — Clause 3.2 (as substituted by Fourth Amendment 2024), p. Gazette p. 100-2 (PDF p.2 of 3); consolidated code (GERC, up to Sep 2024) PDF p.16-17 (Sep 2024) |
| Haryana |
|---|
|
Dakshin Haryana Bijli Vitran NigamSame code as UHBVN. Old sales-manual pages still showing 70 kW refer to the grandfathering band, not to new connections. |
50 kW |
Navigator 30 |
HERC Electricity Supply Code (HERC/29/2014) Reg. 3.2.1, reproduced in DHBVN Sales Circular D-12/2014 (Jan 2014) |
|
Uttar Haryana Bijli Vitran NigamExisting LT connections between 50 and 70 kW are grandfathered until converted; a NEW connection is capped at 50 kW. |
50 kW |
Navigator 30 |
HERC Electricity Supply Code (HERC/29/2014) Reg. 3.2.1, reproduced in UHBVN Sales Circular U-02/2020 (Jan 2014) |
| Himachal Pradesh |
|---|
|
Himachal Pradesh State Electricity Board |
50 kW |
Navigator 30 |
Himachal Pradesh Electricity Supply Code, 2009 as amended by the Himachal Pradesh Electricity Supply (Sixth Amendment) Code, 2025 (Notification No. HPERC/Supply Code/438) — Para 2.1.6.1(A)(a) table and provisos (as substituted by Sixth Amendment, para 4), p. Sixth Amendment p.2-3 (Mar 2025) |
| Jammu and Kashmir |
|---|
|
Jammu Power Distribution Corporation100 kVA (90 kW at 0.9). Read from an Internet Archive copy of the gazette; the regulator site was unreachable. |
90 kW |
Nova 60 |
JERC for the UT of Jammu & Kashmir and the UT of Ladakh (Electricity Supply Code) Regulations, 2023 (No. JERC-JKL/Reg/2023/06) — Regulation 4.3 (Classification of Supply) table and following text, p. Gazette p.84-86 (Mar 2023) |
|
Kashmir Power Distribution Corporation100 kVA (90 kW at 0.9). Read from an Internet Archive copy of the gazette; the regulator site was unreachable. |
90 kW |
Nova 60 |
JERC for the UT of Jammu & Kashmir and the UT of Ladakh (Electricity Supply Code) Regulations, 2023 (No. JERC-JKL/Reg/2023/06) — Regulation 4.3 (Classification of Supply) table and following text, p. Gazette p.84-86 (Mar 2023) |
| Jharkhand |
|---|
|
Jharkhand Bijli Vitran Nigam85 kW / 100 kVA. |
85 kW |
Nova 60 |
JSERC (Electricity Supply Code) Regulations, 2015, as amended by First Amendment 2018 and Second Amendment 2024 — 4.3, 4.7, p. PDF pp.12-13 (Sep 2015) |
|
Tata Steel Utilities and Infrastructure Services (Jamshedpur)85 kW / 100 kVA. |
85 kW |
Nova 60 |
JSERC (Electricity Supply Code) Regulations, 2015, as amended by First Amendment 2018 and Second Amendment 2024 — 4.3, 4.7, p. PDF pp.12-13 (Sep 2015) |
| Karnataka |
|---|
|
Bangalore Electricity Supply Company150 kW / 201 HP / 176 kVA. KERC's consolidated CoS PDF is a 2013 print still showing the superseded 50 kW — three times too low. Exactly 150.0 kW is ambiguous between "inclusive" and "less than" across documents; confirm. An LT connection above 50 kW needs HT-class metering. Temporary supply is capped at 50 kW. |
150 kW |
Nova 120 |
Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020) |
|
Chamundeshwari Electricity Supply Corporation (Mysuru)150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. |
150 kW |
Nova 120 |
Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020) |
|
Gulbarga Electricity Supply Company150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. |
150 kW |
Nova 120 |
Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020) |
|
Hubli Electricity Supply Company150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. |
150 kW |
Nova 120 |
Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020) |
|
Hukeri Rural Electric Co-operative Society150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. |
150 kW |
Nova 120 |
Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020) |
|
Mangalore Electricity Supply Company150 kW / 176 kVA (Ninth Amendment). A 14.08.2026 draft keeps 5 kW single phase but makes three phase below it the licensee's choice. |
150 kW |
Nova 120 |
Conditions of Supply (Ninth Amendment) 2020 cl. 3.02(b)/(c), Karnataka Gazette 24.12.2020 (Dec 2020) |
| Kerala |
|---|
|
Kannan Devan Hills Plantations Company (Munnar)100 kW connected load, or 100 kVA (90 kW at 0.9) contract demand. Domestic EV chargers above 3.3 kW must be three phase. |
90 kW |
Nova 60 |
Kerala Electricity Supply Code, 2014 [KSERC consolidated, 'Updated as on 14-10-2025'] - Regulation 8 table as substituted by Kerala Electricity Supply (Fifth Amendment) Code, 2024 — Regulation 8 (supply voltages for connected loads/contract demands); Regs 8A, 11, 90A, p. Reg 8: PDF page 16; Reg 8A: p.17-18; Reg 11: p.19-21; Reg 90A: p.81-82 (Jan 2014) |
|
Kerala State Electricity Board100 kW connected load, or 100 kVA (90 kW at 0.9) contract demand. Domestic EV chargers above 3.3 kW must be three phase. |
90 kW |
Nova 60 |
Kerala Electricity Supply Code, 2014 [KSERC consolidated, 'Updated as on 14-10-2025'] - Regulation 8 table as substituted by Kerala Electricity Supply (Fifth Amendment) Code, 2024 — Regulation 8 (supply voltages for connected loads/contract demands); Regs 8A, 11, 90A, p. Reg 8: PDF page 16; Reg 8A: p.17-18; Reg 11: p.19-21; Reg 90A: p.81-82 (Jan 2014) |
|
Thrissur Corporation Electricity Department100 kW connected load, or 100 kVA (90 kW at 0.9) contract demand. Domestic EV chargers above 3.3 kW must be three phase. |
90 kW |
Nova 60 |
Kerala Electricity Supply Code, 2014 [KSERC consolidated, 'Updated as on 14-10-2025'] - Regulation 8 table as substituted by Kerala Electricity Supply (Fifth Amendment) Code, 2024 — Regulation 8 (supply voltages for connected loads/contract demands); Regs 8A, 11, 90A, p. Reg 8: PDF page 16; Reg 8A: p.17-18; Reg 11: p.19-21; Reg 90A: p.81-82 (Jan 2014) |
| Ladakh |
|---|
|
Ladakh Power Development Department100 kVA (90 kW at 0.9). Read from an Internet Archive copy of the gazette; the regulator site was unreachable. |
90 kW |
Nova 60 |
JERC for the UT of Jammu & Kashmir and the UT of Ladakh (Electricity Supply Code) Regulations, 2023 (No. JERC-JKL/Reg/2023/06) — Regulation 4.3 (Classification of Supply) table and following text, p. Gazette p.84-86 (Mar 2023) |
| Lakshadweep |
|---|
|
Electricity Department, Lakshadweep100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. |
90 kW |
Nova 60 |
JERC (Electricity Supply Code) Regulations, 2018 - Table 1 under Reg 4.3 as substituted by JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 — Regulation 4.3, Table 1: Standard Voltage of Supply (as substituted by Reg 3(i) of Third Amendment 2024); Regs 4.3 provisos and 4.6 of Principal Regulations, p. Third Amendment: PDF page 7; Principal 2018: PDF pages 9-10 (Gazette pp. 94-95) (Aug 2024) |
| Madhya Pradesh |
|---|
|
MP Madhya Kshetra Vidyut Vitaran Company (Bhopal) |
150 kW |
Nova 120 |
Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025], MPERC Notification No. 570/MPERC/2025, substituting Regulation 3.4 of the MP Electricity Supply Code, 2021 [RG-1(II) of 2021] — Regulation 3.4 (as substituted w.e.f. 28.03.2025); Reg. 3.2(a) declared LT voltages, p. Fifth Amendment PDF p.2 of 7; MPERC Compendium v1.2.6 (updated 18/09/2026) PDF p.9 (printed p.8) (Mar 2025) |
|
MP Paschim Kshetra Vidyut Vitaran Company (Indore) |
150 kW |
Nova 120 |
Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025], MPERC Notification No. 570/MPERC/2025, substituting Regulation 3.4 of the MP Electricity Supply Code, 2021 [RG-1(II) of 2021] — Regulation 3.4 (as substituted w.e.f. 28.03.2025); Reg. 3.2(a) declared LT voltages, p. Fifth Amendment PDF p.2 of 7; MPERC Compendium v1.2.6 (updated 18/09/2026) PDF p.9 (printed p.8) (Mar 2025) |
|
MP Poorv Kshetra Vidyut Vitaran Company (Jabalpur) |
150 kW |
Nova 120 |
Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025], MPERC Notification No. 570/MPERC/2025, substituting Regulation 3.4 of the MP Electricity Supply Code, 2021 [RG-1(II) of 2021] — Regulation 3.4 (as substituted w.e.f. 28.03.2025); Reg. 3.2(a) declared LT voltages, p. Fifth Amendment PDF p.2 of 7; MPERC Compendium v1.2.6 (updated 18/09/2026) PDF p.9 (printed p.8) (Mar 2025) |
| Maharashtra |
|---|
|
Adani Electricity Mumbai160 kW / 200 kVA; 480 kW / 600 kVA for several consumers in one building. |
160 kW |
Nova 120 |
MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 (No. MERC/Legal/2021/66) — Regulation 3.2(a) and 3.2(b), with first proviso after 3.2(f), p. PDF p.10 of 80 (Reg. 3 heading on p.9) (Feb 2021) |
|
BEST Undertaking (Mumbai island city)160 kW / 200 kVA; 480 kW / 600 kVA for several consumers in one building. |
160 kW |
Nova 120 |
MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 (No. MERC/Legal/2021/66) — Regulation 3.2(a) and 3.2(b), with first proviso after 3.2(f), p. PDF p.10 of 80 (Reg. 3 heading on p.9) (Feb 2021) |
|
Maharashtra State Electricity Distribution160 kW / 200 kVA for a single consumer. IN SHARED PREMISES (a mall, plaza or society) the cumulative limit is 480 kW / 600 kVA — a real trap for EV sites inside larger developments. |
160 kW |
Nova 120 |
MERC Supply Code and SoP Regulations 2021, Reg. 3.2(b) (Feb 2021) |
|
Tata Power (Mumbai distribution)160 kW / 200 kVA; 480 kW / 600 kVA for several consumers in one building. |
160 kW |
Nova 120 |
MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 (No. MERC/Legal/2021/66) — Regulation 3.2(a) and 3.2(b), with first proviso after 3.2(f), p. PDF p.10 of 80 (Reg. 3 heading on p.9) (Feb 2021) |
| Manipur |
|---|
|
Manipur State Power Distribution Company |
50 kW |
Navigator 30 |
Joint Electricity Regulatory Commission for Manipur and Mizoram (Electricity Supply Code) Regulations, 2013, consolidated 'with amendment upto 9 July 2019', as adopted by MnERC; First Amendment 2014 (15 Oct 2014) and Fifth Amendment 2016 (10 Oct 2016) also read; MnERC Nineteenth Amendment 2026 (Manipur Gazette Extraordinary No. 32, 12 May 2026) checked — Regulation 3.2, Table 1: Classification of … (Oct 2014) |
| Meghalaya |
|---|
|
Meghalaya Power Distribution Corporation |
50 kW |
Navigator 30 |
Meghalaya State Electricity Regulatory Commission (Electricity Supply Code) (1 of 2026) Regulations, 2026 (Notification MSERC/ESC/2024/16 dated 22 Apr 2026; supersedes MSERC Supply Code Regulations 2018) — Regulation 2.2.1 (Supply voltage for different connected loads) and 2.2.4, p. PDF page 24 of 145 (Apr 2026) |
| Mizoram |
|---|
|
Power and Electricity Department, Mizoram |
50 kW |
Navigator 30 |
The Mizoram Electricity Regulatory Commission (Electricity Supply Code) Regulations 2026 (Notification T.16014/1/2024-MZERC/59 dated 29 Apr 2026; Mizoram Gazette Ex-376/2026) — Regulation 5.2 (Classification of Supply) and 5.5, p. PDF page 19 (Apr 2026) |
| Nagaland |
|---|
|
Department of Power, Nagaland25 kVA connected load (22.5 kW at 0.9); 50 kVA with the consumer's own transformer. |
22 kW |
HT for any DC charger |
Nagaland Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2012 (Notification No. NERC/REGN/2012(A) dated 9 May 2012) — Regulation 2.2 (Voltage of Supply to Consumers), p. n/a (MS Word .doc published by NERC; no fixed pagination) (May 2012) |
| Odisha |
|---|
|
TP Central Odisha Distribution (Bhubaneswar, Cuttack)70 kVA (63 kW at 0.9). A July 2025 draft code proposes 150 kW; not notified as of 17.10.2026. |
63 kW |
Navigator 30 |
OERC Distribution (Conditions of Supply) Code, 2019 — Regulation 134(I), Sl. 1(a) and 1(c); Sl. 2(a), p. 52 (Aug 2019) |
|
TP Northern Odisha Distribution (Balasore)70 kVA (63 kW at 0.9). A July 2025 draft code proposes 150 kW; not notified as of 17.10.2026. |
63 kW |
Navigator 30 |
OERC Distribution (Conditions of Supply) Code, 2019 — Regulation 134(I), Sl. 1(a) and 1(c); Sl. 2(a), p. 52 (Aug 2019) |
|
TP Southern Odisha Distribution (Berhampur)70 kVA (63 kW at 0.9). A July 2025 draft code proposes 150 kW; not notified as of 17.10.2026. |
63 kW |
Navigator 30 |
OERC Distribution (Conditions of Supply) Code, 2019 — Regulation 134(I), Sl. 1(a) and 1(c); Sl. 2(a), p. 52 (Aug 2019) |
|
TP Western Odisha Distribution (Sambalpur)70 kVA (63 kW at 0.9). A July 2025 draft code proposes 150 kW; not notified as of 17.10.2026. |
63 kW |
Navigator 30 |
OERC Distribution (Conditions of Supply) Code, 2019 — Regulation 134(I), Sl. 1(a) and 1(c); Sl. 2(a), p. 52 (Aug 2019) |
| Puducherry |
|---|
|
Electricity Department, Puducherry100 kVA (90 kW at 0.9); EV charging stations up to 167 kVA / 150 kW. |
90 kW |
Nova 60 |
JERC (Electricity Supply Code) Regulations, 2018 - Table 1 under Reg 4.3 as substituted by JERC (Electricity Supply Code) (Third Amendment) Regulations, 2024 — Regulation 4.3, Table 1: Standard Voltage of Supply (as substituted by Reg 3(i) of Third Amendment 2024); Regs 4.3 provisos and 4.6 of Principal Regulations, p. Third Amendment: PDF page 7; Principal 2018: PDF pages 9-10 (Gazette pp. 94-95) (Aug 2024) |
| Punjab |
|---|
|
Punjab State Power CorporationThe code states 100 kVA; 95 kW is that at the code's own PF 0.95. Taking LT where a higher voltage is specified attracts a 15% energy surcharge. |
95 kW |
Nova 60 |
PSERC Supply Code 2024 Reg. 5(2) (Notification PSERC/Secy./Regu.191, in force 14.11.2024) (Oct 2024) |
| Rajasthan |
|---|
|
Ajmer Vidyut Vitran Nigam50 kVA (45 kW at 0.9). |
45 kW |
Navigator 30 |
RERC (Electricity Supply Code and Connected Matters) Regulations, 2021 (Reg. 139), as amended by First Amendment 2023, Second Amendment 2025 and Third Amendment 2026 — Reg. 4.1(a)(i)-(iii), 4.2, 4.3, 4.5 (as substituted 2023), p. Gazette PDF pp.143-146 (printed 527-530); 1st Amendment PDF pp.8-9 (Feb 2021) |
|
Jaipur Vidyut Vitran NigamThe schedules state 50 kVA; 45 kW is that at PF 0.90. Changeover to HT is triggered once recorded maximum demand exceeds 50 kVA more than twice in a financial year. |
45 kW |
Navigator 30 |
RERC Supply Code 2021 Reg. 4.1; JVVNL Tariff 2024 schedule EV/LT-8 (Aug 2024) |
|
Jodhpur Vidyut Vitran Nigam50 kVA (45 kW at 0.9). |
45 kW |
Navigator 30 |
RERC (Electricity Supply Code and Connected Matters) Regulations, 2021 (Reg. 139), as amended by First Amendment 2023, Second Amendment 2025 and Third Amendment 2026 — Reg. 4.1(a)(i)-(iii), 4.2, 4.3, 4.5 (as substituted 2023), p. Gazette PDF pp.143-146 (printed 527-530); 1st Amendment PDF pp.8-9 (Feb 2021) |
| Sikkim |
|---|
|
Energy and Power Department, Sikkim25 kVA connected load (22.5 kW at 0.9); 50 kVA with the consumer's own transformer. |
22 kW |
HT for any DC charger |
Sikkim State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2012 — Regulation 2.2(iv)(a)-(c), p. 10 (Apr 2012) |
| Tamil Nadu |
|---|
|
Tamil Nadu Power Distribution Corporation (TANGEDCO)Up to 150 kW, but 112–150 kW only if the consumer gives transformer space. |
112 kW |
Nova 60 |
Tamil Nadu Electricity Distribution Code (As amended upto 31-03-2024) [TNERC consolidated] — Regulation 26(1)(a)-(c) 'Categories of Supply' (and 26(2)-(3)), p. PDF pages 26-28 (Jun 2020) |
| Telangana |
|---|
|
Co-operative Electric Supply Society, Sircilla56 kW / 75 HP; EV charging stations up to 150 kW. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits domestic to 5 kW. |
56 kW |
Navigator 30 |
TGERC Order on Revised ARR & Retail Supply Tariffs for FY 2026-27 (Chapter 4 Terms and Conditions of Tariff) [primary for 5 kW rule]; also GTCS clause 3.2.1 as substituted by APERC Proceeding No.APERC/Secy/96/2014 dt 31-05-2014 (adopted in Telangana by TSERC Regulation No.1 of 2014) — RST Order FY2026-27 clause 4.11.1(b) and 4.1.3; GTCS clause 3.2.1, p. RST Order: 4.1.3 printed p.246 (PDF p.258); … (Mar 2026) |
|
Northern Power Distribution Company of Telangana (Warangal)56 kW / 75 HP; EV charging stations up to 150 kW. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits domestic to 5 kW. |
56 kW |
Navigator 30 |
TGERC Order on Revised ARR & Retail Supply Tariffs for FY 2026-27 (Chapter 4 Terms and Conditions of Tariff) [primary for 5 kW rule]; also GTCS clause 3.2.1 as substituted by APERC Proceeding No.APERC/Secy/96/2014 dt 31-05-2014 (adopted in Telangana by TSERC Regulation No.1 of 2014) — RST Order FY2026-27 clause 4.11.1(b) and 4.1.3; GTCS clause 3.2.1, p. RST Order: 4.1.3 printed p.246 (PDF p.258); … (Mar 2026) |
|
Southern Power Distribution Company of Telangana (Hyderabad)56 kW / 75 HP; EV charging stations up to 150 kW. GTCS 3.2.1 (2014) still prints 15 kW single phase; the FY2026-27 tariff order limits domestic to 5 kW. |
56 kW |
Navigator 30 |
TGERC Order on Revised ARR & Retail Supply Tariffs for FY 2026-27 (Chapter 4 Terms and Conditions of Tariff) [primary for 5 kW rule]; also GTCS clause 3.2.1 as substituted by APERC Proceeding No.APERC/Secy/96/2014 dt 31-05-2014 (adopted in Telangana by TSERC Regulation No.1 of 2014) — RST Order FY2026-27 clause 4.11.1(b) and 4.1.3; GTCS clause 3.2.1, p. RST Order: 4.1.3 printed p.246 (PDF p.258); … (Mar 2026) |
| Tripura |
|---|
|
Tripura State Electricity Corporation |
150 kW |
Nova 120 |
TERC (Electricity Supply Code) Regulations, 2011 (Third Amendment), 2025 (No.F.25/TERC/2025/1477 dated 31 Jan 2026; Tripura Gazette Extraordinary No. 2026320, 25 Feb 2026), amending Reg 3.2 of TERC Electricity Supply Code Regulation 2011 (dated 17 Oct 2011; Tripura Gazette 13 Mar 2012) — Regulation 3.2 as substituted by para 2 of the Third Amendment (table internally numbered '5.3'); Regulation … (Jan 2026) |
| Uttar Pradesh |
|---|
|
Dakshinanchal Vidyut Vitran Nigam (Agra)50 kW / 56 kVA. |
50 kW |
Navigator 30 |
U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006) |
|
Kanpur Electricity Supply Company50 kW / 56 kVA. |
50 kW |
Navigator 30 |
U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006) |
|
Madhyanchal Vidyut Vitran Nigam (Lucknow)50 kW / 56 kVA. |
50 kW |
Navigator 30 |
U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006) |
|
Noida Power Company (Greater Noida)50 kW / 56 kVA. |
50 kW |
Navigator 30 |
U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006) |
|
Paschimanchal Vidyut Vitran Nigam (Meerut, Noida, Ghaziabad)50 kW / 56 kVA. |
50 kW |
Navigator 30 |
U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006) |
|
Purvanchal Vidyut Vitran Nigam (Varanasi)50 kW / 56 kVA. |
50 kW |
Navigator 30 |
U.P. Electricity Supply Code, 2005 (Gazette Notification No. UPERC/Secy-Supply Code/05-4528 dt 18.02.2005), as revised up to 3rd Amendment (UPERC order 11.08.2006) and later amendments 4-13 — 3.2(i) and 3.3(d), p. PDF p.255 (printed p.17) of UPERC compilation (Aug 2006) |
|
Uttar Pradesh Power Corporation50 kW / 56 kVA. Beware: the UPERC PDF prints the unamended 63 kVA on p.15 and the amended 56 kVA on p.255. The Cost Data Book prevails over the Code. |
50 kW |
Navigator 30 |
UP Electricity Supply Code 2005 cl. 3.2 as amended (3rd Amendment, 11.08.2006); UPERC Cost Data Book 31.12.2025 Notes 13–14 (Aug 2006) |
| Uttarakhand |
|---|
|
Uttarakhand Power Corporation400 V up to 25 kW; 25–75 kW / 88 kVA only through HVDS (a dedicated transformer). |
25 kW |
HT for any DC charger |
UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 (No. F-9(31)/RG/UERC/2020/814) — Regulation 2.1(4), Table 2.1 and proviso, p. Gazette p.508-509 (English gazette PDF p.10-11, scanned) (Oct 2020) |
| West Bengal |
|---|
|
CESC Limited (Kolkata)150 kVA / 127.50 kW per the same guideline. |
127 kW |
Nova 60 |
Guidelines for LV (Single Phase) & MV (Three Phase) Application - for New Connection / Additional Load / Shifting of Supply equal to or below Notified Voltage (i.e. 650 Volts) (file gcsch.pdf, linked as 'Guidelines' from https://www.cesc.co.in/olnc) — 'Submission of Application' section, NOTE item 1, p. PDF page 2 (scanned image page; text read visually) |
|
West Bengal State Electricity Distribution Company200 kVA contract demand (180 kW at 0.9), raised from 125 kVA by WBERC order 03.12.2019. |
180 kW |
Nova 120 |
WBSEDCL PROCEDURES-A (2010) - Procedures for effecting service connection in Low Voltage and Medium Voltage (LV&MV) by WBSEDCL (approved by WBERC order dated 31.12.2010 under Reg 13.13 of WBERC SOP Regulations 2010; LV&MV ceiling amended by WBERC order dated 03.12.2019 in Case OA-88/10-11/3) — Clause 2.2 (single phase); Clause 1.2 as modified by WBERC order 03.12.2019 para 17.0(i) (LV&MV … (Dec 2019) |